The Welfare Hire Co. is a UK-based company that provides temporary welfare facilities for construction sites and outdoor projects. Their offering typically includes portable toilets, mobile welfare units, and site accommodation designed to support workers on-site. The company focuses on compliance with health and safety regulations, ensuring sites have proper sanitation and welfare provisions. They also publish practical guides and resources related to construction, groundwork, and equipment usage. Overall, their service is aimed at making worksites safer, more efficient, and fully equipped for day-to-day operations. Welfare Hire Direct is a UK-based company that specialises in providing eco-friendly welfare units for construction and site-based projects. Their main offering includes solar-powered units equipped with toilets, canteen areas, drying rooms, and workspace facilities. The company focuses on sustainability, using solar energy with biofuel backup to reduce emissions and fuel costs. They deliver and service units nationwide, ensuring they are ready to use and compliant with site requirements. Overall, their services are designed to support on-site teams with reliable, self-contained welfare facilities while minimising environmental impact. “
How to Lay Paving Slabs on Soil (Step-by-Step Guide)
Laying paving slabs directly on soil is possible, but it requires the right groundwork to prevent movement, sinking, weeds and uneven surfaces. Soil is naturally unstable compared with compacted aggregates, so the key is to remove unsuitable material, create a firm base, and ensure proper drainage. This guide explains the safest, most reliable way to lay paving slabs on ground using UK-appropriate best practice.
Before You Start: Plan the Area and Check Conditions
Start by considering what the paving is for—footpaths, garden patios, or light access routes. Loading matters: a path that will only be walked on needs a different base than an area that may take occasional vehicle weight.
Also assess the soil type. Clay-heavy soil expands and contracts with moisture, which can lead to slabs lifting. If your soil is very soft, waterlogged, or heavily organic (peaty topsoil), you should plan for deeper excavation and a stronger base.
Measure the area, account for slab sizes and leave appropriate gaps for jointing (usually a few millimetres to a centimetre, depending on the slab system). If the area is larger or the ground is uneven, lay out a string line or use a laser level for accuracy.
Materials and Tools You’ll Need
You will typically need:
-
Paving slabs (and matching edging/kerbs if required)
-
Sharp sand or kiln-dried sand (for the slab bedding layer)
-
Mot type 1 or granular sub-base aggregate (for the base layer)
-
Weed control membrane (optional but often useful)
-
Impacement/compaction equipment (a plate compactor is strongly recommended)
-
Hand tools: shovel, rake, tamper, spirit level or straightedge
-
Spirit level and/or string line
-
Garden hose or watering can (for controlled compaction)
-
Jointing material: kiln-dried sand or paving jointing compound
-
Protective equipment: gloves, safety boots, and eye protection
If the paving sits near a building, ensure you keep a slight fall (slope) away from foundations so surface water can drain naturally. A fall of around 1:60 is a common guideline for patios and paths.
Step 1: Remove Topsoil and Unsuitable Material
The most important part of laying paving slabs on soil is removing the topsoil. Topsoil contains organic material that breaks down and settles, causing paving to sink and become uneven.
Excavate the area to a depth that allows for the base, bedding and slab thickness. A typical approach is:
-
Remove topsoil to a depth of 150–250mm (depending on soil type and project use)
-
Excavate further if the soil is soft, wet, or unstable
As a practical rule, for most pedestrian patios on average soil, you’ll be looking at roughly:
-
~100mm of compacted sub-base (Mot type 1)
-
~25–40mm of bedding sand
-
Slab thickness (commonly 30–50mm)
Your exact depth may vary, so use your slab thickness and the base requirement for the intended use.
Step 2: Create a Firm, Level and Correctly Sloped Sub-Base
Once excavated, remove stones and roots that could create voids. If you’re using membrane, place it over the prepared soil to reduce weed growth (avoid covering with sand that could trap water; drainage is still crucial).
Place Mot type 1 (or similar granular sub-base) in layers—usually no more than 50–75mm at a time. Compact each layer thoroughly with a plate compactor. Compaction is what turns loose granular material into a stable base. Skipping this step is one of the main reasons paving fails.
Use a straightedge or string line to maintain the correct levels and fall. If needed, add or remove aggregate to fine-tune the surface height.
Step 3: Lay a Bedding Layer for the Slabs
After the sub-base is compacted, spread a bedding layer of sharp sand or kiln-dried sand. The bedding layer is usually around 25–40mm, but aim for a depth that allows the slab to be bedded firmly without crushing the base.
Do not over-compact the bedding sand; it should be firm but able to allow small adjustments. A common method is to strike off (level) the sand so it is consistent across the area.
Keep the bedding slightly higher than the final finished level so you can set slabs accurately by tapping them down into place.
Step 4: Position the Slabs
Begin at the most visible edge or a fixed line such as a boundary, edging strip, or a corner. Lay the slabs from one side to the other, keeping joints even.
For each slab:
-
Set the slab onto the bedding sand
-
Tap it gently with a rubber mallet until it sits at the correct level
-
Use a spirit level and straightedge to check alignment
-
Maintain consistent joints between slabs
Avoid putting too much weight on partially laid slabs. If you need to step across the area, place boards to spread your weight.
Step 5: Cut Slabs Cleanly for Edges
Most paving layouts require cutting at boundaries and around features. Use an angle grinder with a suitable blade or a proper paving cutter, and follow safe handling procedures.
Remember to allow for the jointing gap at edges as well. Cutting slab edges can be the difference between a professional finish and a patchy one.
Step 6: Jointing (Filling the Gaps)
Once all slabs are set and level, fill the joints with kiln-dried sand. Sweep it into gaps thoroughly and remove excess from the slab faces. Compacting the paving after jointing can help settle the sand, but do so carefully—some slab types are more sensitive to vibration.
For best results, apply jointing in stages and top up if the sand settles after rain or compaction.
Alternatively, if your slab system specifies a jointing compound, follow the manufacturer’s guidance. Some compounds are designed to lock joints and reduce movement and weed growth.
Step 7: Edge Restraint and Drainage Considerations
If you lay paving on open soil, edges should usually be restrained with kerbs, edging strips, or a concrete border. Without edge support, slabs can shift over time as soil moves and water flows underneath.
Good drainage is essential. Do not trap water under the paving. If you’re in an area with poor drainage, consider improving the sub-base design and fall, and allow for proper water dispersal away from structures.
Common Mistakes to Avoid
-
Laying slabs on topsoil without removing organic matter
-
Skipping compaction of the sub-base
-
Using soft sand as the base instead of a proper sub-base aggregate
-
Setting slabs without checking levels and fall
-
Over-compacting bedding sand, which can prevent correct final setting
-
Neglecting edging restraint, leading to lateral movement
Health and Safety Notes for Site Work
Even small groundwork can carry risks. Use correct personal protective equipment: gloves and safety boots for moving slabs and aggregates, eye protection for cutting, and hearing protection when using powered tools. Keep the work area tidy to reduce trips and falls, and ensure tools are stored safely when not in use.
If you’re handling excavation deeper or dealing with unstable ground, consider getting professional advice—groundwork safety and stability matter as much as the finished surface.
Final Thoughts
Laying paving slabs on soil is achievable, but success depends on proper excavation, a well-compacted sub-base, correct bedding, and careful slab setting. Treat the soil as something to remove or stabilise, not something to build on directly. With the right groundwork and good drainage, your paving will look level, stay firm under foot, and resist common problems like sinking and weeds.
“